top of page

Greenfield Parkway Bridge Replacement

The Greenfield Parkway Bridge has been closed due to structural failure. Construction is scheduled from August through November 2025 as part of the NH Bridge Aid Program.

GreenfieldCrane.jpg

Barnside Drive & Trellis Way

Drainage and paving work is currently underway in the Barnside Drive Area.

BarnsideDr.jpg

Beals Road
Bridge Replacement

​The Beals Road Bridge will be replaced with a new structure, including minor roadway improvements. Construction will include full removal of the existing bridge.

Beals Road Bridge Existing

Holbrook Hill Road
Paving Project

The final phase of road reconstruction is underway. The project is expected to be completed during the 2025 construction season.

IMG_0055.jpg

Old Bedford Road
Sidewalk Project

A new sidewalk is planned for construction along the east side of Old Bedford Road. 

Old Bedford Road Sidwalk Project Map

Presidential Area

Drainage and paving work is currently underway in the Presidential Area. This includes improvements on Hamilton Way, Jefferson Road, Roosevelt Drive, and Kennedy Drive.

Roosevelt

TIF District (South River Road)

Road paving to begin 10/3/2025. Expect ongoing delays.

Roosevelt

Woburn Abbey Dr

Road paving to begin week of 10/13/2025. Expect ongoing delays.

Bedford Accreditation Logo.png

The Town of Bedford is working to improve several key areas of its integral roadways.    

​

© 2025 by the Town of Bedford, New Hampshire

55 Constitution Drive, 2nd Floor

Bedford, NH   03110

(603) 472-3070

Bedford Accreditation Logo.png
bottom of page